Subscribe to Windows IT Pro
April 12, 2009 12:00 AM

Q. Can I perform multiple Live Migrations concurrently in a cluster?

Windows IT Pro
InstantDoc ID #101856
Rating: (0)

A. This really depends on how many nodes you have in your cluster. If you have three or fewer, then no.

You can only perform one live migration concurrently for each pair of nodes involved in the live migration (the source and target). If you have four-node cluster with nodes A, B, C, and D, you could be performing a live migration between A and B and a separate live migration at the same time between C and D with no problems. You couldn't have a live migration between A and B and another between B and C at the same time, however.

Related Reading

Videos:

Audio:


Check out hundreds more useful Q&As like this in John Savill's FAQ for Windows. Also, watch instructional videos made by John at ITTV.net.

Related Content:

ARTICLE TOOLS

Comments
    There are no comments to display. Be the first one!
You must log on before posting a comment.

Are you a new visitor? Register Here

advertisement

advertisement

Windows is a trademark of the Microsoft group of companies. Windows IT Pro is used by Penton Media Inc. under license from owner.